Existing infrastructure
- Highly reliable power supply at 36/150 kilovolts from GRIS/Co-generation unit with step-down capability from 6 kilovolts to 690/380 volts
- Steam generating capacity with distribution at a number of pressure levels up to
- 42 bar (± 600 psi)
- Nitrogen supply by pipeline at 25 bar with distribution networks at 25 and 7 bar
- Compressed air production capacity with supply at 7 bar
- City water supply with networks for fire-fighting, process and sanitary purposes,
- as well as demineralized water production capacity
- Natural gas pipeline at 60 bar; internal distribution at 6.5 bar
- Comprehensive sewerage system linked with a biological waste-water treatment station
- Complete solid waste sorting and handling facilities
All utilities and waste handling facilities are ISO 9002 certified.Our transport infrastructure
includes an on-site railhead and fully equipped tanker loading and unloading facilities.
The Essent co-generation unit with a capacity of 135 megawatt and operated by INEOS will be on line mid 2006.
ISO 9002 Certificates